Characteristic Based Planning with mySAP SCM™ - Scenarios, Processes, and Functions

von: Jörg Thomas Dickersbach

Springer-Verlag, 2005

ISBN: 9783540267508 , 162 Seiten

Format: PDF, OL

Kopierschutz: Wasserzeichen

Windows PC,Mac OSX geeignet für alle DRM-fähigen eReader Apple iPad, Android Tablet PC's Online-Lesen für: Windows PC,Mac OSX,Linux

Preis: 53,49 EUR

Mehr zum Inhalt

Characteristic Based Planning with mySAP SCM™ - Scenarios, Processes, and Functions


 

Contents

7

1 Motivation for Planning with Characteristics

10

2 Characteristic Based Planning Overview

12

2.1 Process Overview

12

2.2 Scenarios for Characteristic Based Planning

14

2.3 System Configuration Determinants

19

2.4 Functions for Characteristic Based Planning in APO

22

2.5 Process Variants and their Usage in the Scenarios

24

3 Characteristics and Classes

28

3.1 Characteristics and Classes in R/3

28

3.2 Transfer of Characteristics and Classes to APOThe transfer of classes and characteristics to APO is done via the CIF,

31

4 Configuration Scheme in APO

34

5 Make-to-Order with Variant Configuration

36

5.1 Scenario Description

36

5.1.1 Process Chain

36

5.1.2 System Configuration Determinants

38

5.1.3 Configurable Material

39

5.1.4 Configuration Profile

39

5.2 Variant Configuration in the Sales Order

40

5.3 Object Dependencies

43

5.3.1 Structure and Usage of Object Dependencies

43

5.3.2 Selection Conditions

47

5.3.3 Procedures

47

5.3.4 Procedures with Reference Characteristics

48

5.3.5 Variant Functions

51

5.4 Multi-Level Configuration

53

5.5 Configuration via Material Class

55

5.6 Material Variants

56

5.7 Configurable Material Variants

59

5.8 Variant Tables

61

6 Make-to-Order with VC and Demand Planning

63

6.1 Make-to-Order with VC and Planning Overview

63

6.2 Characteristic Based Forecasting

64

6.3 Forecast Release and Forecast Consumption

68

6.4 Scenario Description for Planning in Inactive Version

73

6.4.1 Process Chain for Planning in Inactive Version

73

6.4.2 System Configuration Determinants

78

6.4.3 Transformation of the Dependent Demand

79

6.4.4 Forecast Consumption by the Dependent Demand

80

6.4.5 Component Logic

82

6.5 Scenario Description for Planning in Active Version

83

6.5.1 Process Chain for Planning in Active Version

83

6.5.2 System Configuration Determinants

87

6.5.3 Forecast Check on Characteristic Level

87

6.5.4 Allocation Check on Characteristic Level

88

6.5.5 Forecast Consumption on Characteristic Level

89

7 Sales from Stock with Characteristics

90

7.1 Scenario Description

90

7.1.1 Process Chain

90

7.1.2 System Configuration Determinants

92

7.2 Batch Selection in the Sales Order

93

7.3 ATP with Characteristics

96

7.3.1 Characteristic View

96

7.3.2 Rules-Based ATP with Characteristic Substitution

97

7.4 Delivery with Characteristics

100

8 Configure-to-Order with Propagation

102

8.1 Scenario Description

102

8.1.1 Process Chain

102

8.1.2 System Configuration Determinants

104

8.2 Characteristic Propagation within the PPM

106

8.3 Block Planning

109

8.3.1 Motivation for Block Planning

109

8.3.2 Block Definition in the Resource

110

8.3.3 Activity Valuation

113

8.3.3 Block Planning Functions

116

8.3.4 Assembly Planning Based on Block Definitions

116

8.4 Goods Receipt with Batch Characteristics

118

9 Planning with Shelf Life

120

9.1 Scenario Description

120

9.1.1 Process Chain

120

9.1.2 System Configuration Determinants

121

9.1.3 Shelf Life Settings in the Material Master

122

9.2 Shelf Life Functionality

123

9.3 Characteristics for Shelf Life

125

9.4 Customer Specific Shelf Life Requirements

127

9.5 Production Planning and Scheduling with Shelf Life

131

9.6 Goods Receipt with Shelf Life Characteristics

132

9.7 Shelf Life Alerts

133

10 Sales Order Oriented Planning

135

10.1 Scenario Description

135

10.1.1 Process Chain

135

10.1.2 System Configuration Determinants

137

10.2 Descriptive Characteristics

137

10.3 Forecast Adjustment

139

10.4 Planned Order Conversion with Conversion Rules

141

11 Production Planning and Scheduling

143

11.1 Production Planning with Characteristics

143

11.1.1 Production Planning with the VC-Configuration

143

11.1.2 Production Planning with the CDP-Configuration

144

11.2 Detailed Scheduling with Characteristics

146

11.2.1 Impact of Characteristics on Detailed Scheduling

146

11.2.2 Characteristics as Sorting Criteria for Heuristics

147

11.2.3 Characteristics for Set-Up Group Determination

150

11.3 Planned Order Integration

151

11.4 Display of Characteristics in the Product View

153

References

155

Abbreviations

157

Implementation Samples

158

Transactions

162

Index

164